
I-Beam Attachment
Meets NFPA®-13 requirements for seismic sway bracing.

1/2"
Step 1: Place the I Beam Attachment around the beam
Step 2: Finger tighten nuts then bolts, next tighten all nuts and bolts until heads snap off.
Step 3: Install Universal Structural Attachment for attaching to brace pipe.
Material : Steel
Coating : Zinc Plated
Approval : UL Listed and FM Approved
• Snap-off bolt head helps enable easy installation and inspection of seismic sway braces
• Meets NFPA®-13 requirements for seismic sway bracing
UL Yükleri:
FM Yükleri: